The Millenium Hotel contacted our Service Retrofit team to replace a failing packaged Trane roof top unit. The Service Retrofit team was able to replace this 100 ton machine in an 8 hour day and have them up and running.
The Millenium Hotel contacted our Service Retrofit team to replace a failing packaged Trane roof top unit. The Service Retrofit team was able to replace this 100 ton machine in an 8 hour day and have them up and running.