HVAC
Because the conditions of any work environment affect everything from productivity to culture, the need for an HVAC system to work as expected cannot be overstated. Our approach to HVAC systems is rooted in a continuum of safety, quality and productivity. To ensure our customers benefit from our specialized process, we persistently utilize local dispatching, adhere to schedules as agreed upon with our customers, execute follow up calls after every installation to gain feedback and implement third-party surveys.
Projects
Longmont United Hospital Medical Office Building Benefits from HVACR Retrofit
Longmont United Hospital is a general medical and surgical hospital serving Boulder County, Colorado, and surrounding communities for over five decades. For the past several years, Longmont United Hospital has relied on Timberline Mechanical to provide expert HVACR repair and maintenance services for their main campus in central Longmont as well as their satellite location in Frederick, Colorado.
Retrofitting a Biopharmaceutical Process Area
Recently, Timberline was called upon to retrofit an existing biopharmaceutical process area to accommodate twice the amount of air it currently had available. The customer wanted to increase their production of product in this specific process area, and needed higher amounts of ventilation, as well as makeup air.
Avery Brewery Company HVAC Design-Build & Engineering of Steam Plant and Chiller Water Plant
Avery Brewing Company has been a client of Timberline Mechanical for a number of years. In September of 2013, they approached us with a dilemma; Avery was flourishing, and their building was becoming obsolete due to these “growing pains.”
University of Colorado Gear Reducer Replacement
The University of Colorado contracted with our Service Team to replace a 90-degree gear reducer that had failed on a Marley fiberglass direct cooling tower.
NIST Building 1 AHU Replacement
Wing 6 of Building 1 at the National Institute of Standards and Technology has mixing boxes throughout this wing of building 1. This wing of the building has tight temperature and relative humidity requirements. The existing system was on i...
Movement Climbing and Fitness Split Systems
When we partnered with Movement Climbing and Fitness to build their new state of the art Climbing Facility in Denver, one aspect of the design was installing equipment that could provide great temperature control, high efficiency, and great filtration.
Movement Climbing and Fitness Addison MAU Install
Our existing customer Movement Climbing and Fitness really wanted us to build their new state of the art Climbing Facility in Denver so we took on the challenge.
Millenium Hotel Large Train RTU Replacement
The Millenium Hotel contacted our Service Retrofit team to replace a failing packaged Trane roof top unit. The Service Retrofit team was able to replace this 100 ton machine in an 8 hour day and have them up and running.
Longmont United Hospital Joy Fan Motor and Blade Replacement
The Timberline Service Team was contracted with to make repairs to the large joy fan that provides supply air to the hospital.
Longmont United Hospital Boiler Replacement
Timberline Mechanical was contracted by Longmont United Hospital to replace three large standard-efficiency Weil McLane boilers and a large indirect water heater heated by the boilers.
Lefthand Brewing Company Steam Boiler Install
Timberline was contracted by Lefthand Brewing Company to do both the Steam and Chiller water design and install. The photo is the finished install of the Steam system install.
Lefthand Brewing Company 140 ton Chiller Install
Timberline was contracted by Lefthand Brewing Company to do both the Steam and Chiller water design and install.
Exeter Building Large Aaon RTU Replacement
Our customer Transwestern Commercial contracted with Timberline Mechanical to replace 2 – 100 ton and 1 – 90 ton Mammoth packaged cooling only roof top units along with the equipment controls.
Crescent Property Management Large RTU Motor Replacement
The supply fan motor in this packaged rooftop unit failed due to bearing fluting. The service team sourced a replacement motor along with a shaft grounding device and performed the replacement.
Service Retrofit at the University of Colorado
We are working on a Service Retrofit project for the University of Colorado at the Bear Creek student housing in Boulder. We are replacing blower motors, blower wheels, isolation valves, control valves, and y strainers on over 200 HW/CW Fan...
Specialized Bicycles
In November 2022, our long-standing customer reached out to see if we would be interested in performing a Due Diligence for Specialized Bicycles. Specialized Bicycles was under contract to purchase a building in Louisville, Colorado and needed a pre-purchase Due Diligence to ensure they were getting a high-quality functional HVAC system and to help with price negotiations.
329 Interlocken RTU Replacement Project
We have developed a great long-term relationship with customer, EQT Exeter. We started at a small building in Louisville, CO performing a Due Diligence of the HVAC equipment and were then asked to survey two more buildings in the Interlocke...